The main structure of Hongshengsha Station along the second phase of Guangzhou's Metro Line 7 was recently topped off.
The second phase of the line spans 21.9 kilometers from Higher Education Mega Center South Station to Shuixi North Station. En-route stops include the Shenjing, Changzhou, Hongshengsha, Yufengwei, Dashadong, Jitang, Jiazhuang, Kefeng Road, Luogang, and Shuixi stations.
Passengers will be able to transfer to the Pazhou feeder of the Guangzhou-Dongguan-Shenzhen Intercity Railway, the east extension line of Metro Line 8, as well as Metro Line 13, 5, 19, 6 and 21. The maximum speed of the six-wagon train will be 80 km per hour.
The main structure of Hongshengsha Station along the second phase of Guangzhou's Metro Line 7 has been topped off.
Once the second phase of Metro Line 7 comes into operation, it will facilitate travel between Hongshengsha Island and downtown Guangzhou.
Located in the Pearl River estuary, Hongshengsha is near Changzhou Island in the west and Dajisha Island in the east. It forms part of the Guangzhou's Second Central Business District.
The island will focus on the development of yacht and leisure tourism, while integrating innovative finance, maker spaces, cultural tourism and business facilities.