Home > About Us> Gallery

Huangpu tram line 1 to start operation

Updated : 2020-06-28

微信图片_20200628161922.jpg

The side exterior of the train applies magenta and light gray as its dominant hue.

The demonstration section of the Huangpu tram line 1 is expected to be put into operation in July, bringing more transportation convenience for local residents.

The train, which applies magenta and light gray as its dominant hue, is decorated with plum blossoms on its side exterior.

The train is 37 meters in its overall length, 2.65 meters in width, and 3.68 meters in height. Each train has 50 seats and is expected to carry a maximum of 360 people.

The running interval of the tram line during rush hours can be shortened to nine minutes, with a maximum operating speed of 70 kilometers per hour. The whole line has few traffic lights, making the whole trip faster and more convenient.

Aiming to better serve local residents, the height between the train floor and the platform is lower than 35 centimeters, allowing children and seniors to get on and off the train easily. Other facilities, such as wheelchair safety belts and armrests, are also available on the train for the disabled.

微信图片_20200628161929.jpg

Convenient facilities, such as wheelchair safety belts and armrests, are available on the train for the disabled.


Copyright © Guangzhou Development District People's Government.
All rights reserved. Presented by China Daily
粤ICP备16087157号-1