Hohhot Metro Line 2 passes inspections with flying colors
Hohhot Metro Line 2 carries out trial operations on May 20. [Photo/Yuquan District Government]
Hohhot Metro Line 2 is set to open after the 64 unit projects passed the acceptance inspection on Aug 26, according to local media reports.
In this stage of acceptance, four inspection groups were formed by the companies that have taken part in the subway's construction to carry out the formal approval of the main structure, decorations and ancillary projects at each metro station.
Personnel from the Hohhot Quality Supervision Station monitored the entire acceptance process.
The interior look of a metro train [Photo/Hohhot Daily]
Line 2's 64 unit projects have met the design and contract requirements and passed the acceptance inspection with flying colors – laying a solid foundation for the metro line's opening.
The metro line starts at Talidong Station in the north and ends at Arxan Road Station in the south and has a total distance of 27.3 kilometers. A total of 23 stations are spread across the route.