Home > Culture and Tourism> Transportation

Guangzhou Metro Line 7 Phase II sees construction progress

Updated : 2021-03-05

The left-hand tunnel of the Guangzhou Metro Line 7 Phase II section between Shuixi and North Shuixi stations achieved a breakthrough on Feb 28.

The second phase of Guangzhou Metro Line 7 spans 22 kilometers from South High Education Mega Station to North Shuixi Station, with six-wagon vehicles traveling at a maximum speed of 80 km per hour.

En-route there will be 11 stops at Shenjing, Changzhou, Hongshengsha, Yufengwei, Dashadong, Jitang, Jiazhuang, Kefeng Road, Luogang, Shuixi and North Shuixi.

640.webp (1).jpg

The left-hand tunnel of the Guangzhou Metro Line 7 Phase II section between Shuixi and North Shuixi stations achieves a breakthrough on Feb 28.

Passengers can also transfer to the Pazhou feeder line of Guangzhou-Dongguan-Shenzhen Intercity Railway, the east extension line of Guangzhou Metro Line 8, as well as Guangzhou Metro Lines 13, 5, 19, 6 and 21.

The project is of great importance in terms of meeting the traffic demands of eastern Guangzhou and boosting the integrated development of Guangzhou and Foshan.


Copyright © Guangzhou Development District People's Government.
All rights reserved. Presented by China Daily
粤ICP备16087157号-1